




This job came at the last minute as a compliance issue with additional structures requiring an extra fire hydrant. The system is boosted with diesel pumps. The materials used was red line PE to suit existing and the jointing method was EF Poly Welding. Our biggest challenge here was time constraints and limited access. We got this job done with minimal notice to ensure major works were completed over the holidays as well as working in with other trade contractors and delivery drivers to ensure no hold of up works suffered and time blowouts occurred.
1300 066 766






To be South East Queensland’s most trusted commercial hydraulic partner, recognized for setting industry benchmarks in asset reliability, compliance, and integrated energy-water efficiency.
To deliver uninterrupted, high-performance plumbing solutions through rapid response, transparent reporting, and advanced non-destructive technologies—protecting your facility's operational integrity every day.
Request a free site assessment. We’ll identify exactly what your drainage needs, design a program that fits your operations, and give you transparent pricing.
Unit 4, 22 Kremzow Road, Brendale QLD 4500